Skip to main content
AppleVis

Main navigation

  • Apps
  • Forum
  • Blog
    • Podcast
    • Guides
    • Hardware & Accessory Reviews
    • Bug Tracker
    • Developer Resources
  • Log in

Breadcrumb

  1. Home
  2. Forums
  3. macOS and Mac Apps

How to change order of spoken feedback with VO on Mac

By Becca, 26 March, 2016

Forum
macOS and Mac Apps

Hello.
I'm not sure I'm asking my question the right way, but I was wondering how to change the order of spoken feedback that VO announces. For example, when navigating on IOS, VO says the contents of the heading, and then heading level 1 etc. How do I change this on Mac so VO announces the heading contents, and then heading level?
Thank you.

Options

  • Log in or register to post comments

Comments

*not* possible

By kevinchao89

7 years 6 months ago

Although, this would be great, and extremely useful. I don't know of a way of doing this in VoiceOver utilities.
Maybe, it has to be requested as a feature request?

I found it

By Becca

7 years 6 months ago

In reply to *not* possible by kevinchao89

Hi. I found it by searching for another thread on here. Search "speech settings question." And you'll find it.
Thank you for your help.

Instructions

By kevinchao89

7 years 6 months ago

Comment permalink:
http://www.applevis.com/comment/51629#comment-51629

More Like This

empires order (iOS and iPadOS App Directory)
Spoken Verse (Forum Topic)
Grim Quest - Old School RPG (iOS and iPadOS App Directory)
World Order — The Game (iOS and iPadOS App Directory)
Siri and ordering rides (Forum Topic)
Spoken Games Apps (Forum Topic)
Spoken Games and IOS 8 (Forum Topic)
Spoken Bible Verse (Forum Topic)

Site Information

  • About
  • Club AppleVis
  • FAQ
  • Contact

Unless stated otherwise, all content is copyright AppleVis. All rights reserved. © 2023 | Accessibility | Terms | Privacy